HARNESSING UNTAPPED HYDROPOWER

T.J. Hammons

References

  1. [1] Winnipeg Free Press magazine, May 6, 2001, p. B1; Insights,Manitoba Hydro, 10(1), May 2000.
  2. [2] Working with Aboriginal Groups, Hydro Lines, 40(3), June2000.11
  3. [3] J.B. Thorsteinsson, Winnipeg Hydro’s innovative hydraulicturbine technology, The Keystone Professional (Associationof Professional Engineers and Geoscientists of the Province ofManitoba), August 2000.
  4. [4] China’s construction in four decades, Coastal InternationalConsultant Co., Ltd., and Information Institute of Water Resources and Electric Power, Ministry of Energy of the People’sRepublic of China (MOE), Ministry of Water Resources of thePeople’s Republic of China (MWR), 1989.
  5. [5] P.C.S. Krishnaya et al., An evaluation of the R & D requirements for developing HVDC converter stations for voltages above ±600 kV, 1988 Session of CIGRE, 28 August–3September, Paris, paper 14-07.
  6. [6] A. Clerici & G. Valtorta, Long distance transmission of bulkpower: The EHV-UHVDC Challenge, Asea Brown BoveriGroup (ABB) STE, Italy, 1994.
  7. [7] Working Group 38.04, Ultra high voltage technology, 1994Session of CIGRE, 28 August–3 September, Paris, paper37/38-01.
  8. [8] Y. Yamagata et al., Development of 1100 kV GIS-gas circuitbreaker, disconnectors and high-speed grounding switches, 1996Session of CIGRE, 26–29 August, Paris, paper 13-304.

Important Links:

Go Back