Jizhong Zhu, Wei Yan, Ye Lin, Pengfei Yu, and Xiaofu Xiong
[1] A.N. Niazi, A. Badri, and S. Khoshnoud, Annual coordinatedgeneration and transmission maintenance scheduling consid-ering network constraints and energy not supplied, International Transactions on Electrical Energy Systems, 55(4), 2014,775–795. [2] S.M. Hussin, M.Y. Hassan, and L. Wu, Coordinated generationand transmission maintenance scheduling considering networkconstraints via GGDF and ODF, International Journal ofIntegrated Engineering, 8(1), 2016, 25–34. [3] M. Abirami, S. Ganesan, S. Subramanian, and R. Anand-hakumar, Source and transmission line maintenance outagescheduling in a power system using teaching learning basedoptimization algorithm, Applied Soft Computing Journal, 21,2014, 72–83. [4] A. Badri, A.N. Niazi, and S.M. Hoseini, Long term preventivegeneration maintenance scheduling with network constraints,Energy Procedia 14, 2012, 1889–1895. [5] J.F. Dopazo and H.M. Merrill, Optimal generator maintenancescheduling using integer programming, IEEE Transactions onPower Apparatus and Systems, PAS-94 (5), 1975, 1537–1545. [6] H.H. Z¨urn and V.H. Quintana, Generator maintenance schedul-ing via successive approximations dynamic programming, IEEETransactions on Power Apparatus and Systems, 94(2), 1975,665–671. [7] M.K.C. Marwali and M. Shahidehpour, Integrated generationand transmission maintenance scheduling with network con-straints, IEEE Transactions on Power Systems, 13(3), 1998,227–244. [8] T. Satoh and K. Nara, Maintenance scheduling by using thesimulated annealing method, IEEE Transactions on PowerSystems, 6, 1991, 850–857. [9] E.L. Silva, M. Morozowski, L.G.S. Fonseca, G.C. Oliveira,A.C.G. Melo, and J.C.O. Mello, Transmission constrainedmaintenance scheduling of generating units: A stochasticprogramming approach, IEEE Transactions on Power Systems,10(2), 1995, 695–701. [10] H. Pandzic, A.J. Conejo, I. Kuzle, and E. Caro, Yearlymaintenance scheduling of transmission lines within a marketenvironment, IEEE Transactions on Power Systems, 27(1),2012, 407–415. [11] E. Reihani, M.O. Buygi, and M. Banejad, Generation main-tenance scheduling using hybrid evolutionary approach, TheInternational Conference on Electrical Engineering, Espoo,Finland, 2008. [12] K.P. Dahal and N. Chakpitak, Generator maintenance schedul-ing in power systems using metaheuristic-based hybrid ap-proaches, Electric Power Systems Research, 77(7), 2007, 771–779. [13] R. Eshraghnia, M.H.M. Shanechi, and H.R. Mashhadi, Genera-tion maintenance scheduling in power market based on geneticalgorithm, IEEE PSCE, 1814–1819, Atlanta, 2006. [14] J. Shu, L.Z. Zhang, and X.C. Huang, Mathematical model ofcoordination generation and transmission maintenance schedul-ing in electricity market, Automation of Electric Power Sys-tems, 31(2), 2007, 27–31. [15] E.K. Burke and A.J. Smith, Hybrid evolutionary techniquesfor maintenance scheduling problem, IEEE Transactions onPower Systems, 15(1), 2000, 122–128. [16] NERC, Policy 4: System Coordination, 2005. [Online]. Avail-able: http://www.nerc.com [17] Y. Fu, M. Shahidehpour, and Z.Y. Li, Security-constrained op-timal coordination of generation and transmission maintenanceoutage scheduling, IEEE Transactions on Power Systems,22(3), 2007, 1302–1313. [18] J.Z. Zhu, Optimization of power systems operation, 2nd ed.(New York: Wiley-IEEE Press, 2015). [19] H. Karami, M.J. Sanjari, and G.B. Gharehpetian, Hyper-spherical search (HSS) algorithm: a novel meta-heuristic al-gorithm to optimize nonlinear functions, Neural Computing &Applications, 25(6), 2014, 1455–1465. [20] S.A. Ahmadi, Human behavior-based optimization: A novelmetaheuristic approach to solve complex optimization prob-lems, Neural Computing & Applications, 27(1), 2016, 1–12.
Important Links:
Go Back