T.J. Hammons
[1] European Communities, Towards a European strategy for the security of energy supply, Green Paper, 2001. ISBN 92-894-0319-5. [2] W. Leonhard & M. Grobe, Nachhltige Elektrische Energie-versorgung mit Windenergie, Biomasse und Pumpspeicher[Sustainable electrical energy supply with wind, biomass and pumped storage: A realistic long-term strategy or utopia?], EW, Das Magazin f¨ur die Energiewirtschaft, Berlin, 103 (5), 2004, 26–31. [3] M. Durstewitz, B. Hahn, M. Hoppe-Kilpper, G. Czisch,C. Enßlin, K. Rohrig, C. Nath, & V. Köhne: Offshore-Windenergienutzung in der AWZ – Potenziale, Netzintegra-tion, Stromgestehungskosten – Windenergie Report Deutsch-land 2002. [4] Windblatt, Enercon Magazin 05, 2002. [5] J. Schwarz & K. Staschus, Systemverantwortung – Vorausset-zung für eine sichere Stromversorgung, Energiewirtschaftliche Tagesfragen 2003, H. 3, S. 446–450. [6] M. Luther & W. Winter, Erweiterte Anforderungen anWindenergieanlagen zur Aufrechterhaltung der Systemsta-bilität. Husum Wind 2003. [7] Electricity Storage Association, Large scale electricity storage technologies, http://www.electricitystorage.org/ [8] P. Bresesti, B. Cova, K. Robo, & P. Scarpellini, Large interconnected systems: An integrated approach for planninginterconnections among isolated systems or reinforcing already existing interconnections, 1st Balkan Power Conference, Bled (Slovenia), September 2001. [9] J.P. Desbrosses, International Interconnections of Power Systems. What Trends for the Next Decade?, CIGRE General Session, Paris, August 2000. [10] UCTE, Union for the Co-ordination of Transport of Electricity: www.ucte.org. [11] H. Brumshagen & J. Schwarz, The European Power Systemon the Threshold of a new East–West Co-operation, IEEETransaction on Energy Conversion, 11 (2), 1996, 462–474. doi:10.1109/60.507661 [12] C. Lemaıtre et al., Analysis of Operation of the forthcoming Mediterranean Ring, Group 37-1, CIGRE General Session, Paris, August 2002. [13] H.-Ju. Haubrich, & N.I. Voropai, Globalization and liberalisation in the European Electricity Industry, Energoatomizdat, Moscow, 2000. [14] Y.N. Kucherov, On concept of joint operation of the East and West Interconnections, Electricity, 6, 2000. [15] Y.N. Kucherov, On preparation of power plants for synchronous operation of the UES of Russia with European Interconnections, Power Stations, 4, 2000. [16] Y.N. Rudenko & V.A. Semenov, Automation of DispatchControl in Electric Power Industry (Moscow: MPEI, 2000). [17] www.ucte-ipsups.org
Important Links:
Go Back