SIMULATION METHODOLOGY OF MULTIPLE WIND FARMS OPERATION CONSIDERING WIND SPEED CORRELATION

Ning Zhang, Chongqing Kang, Changgang Duan, Xiaojun Tang, Jianjun Huang, Zhan Lu, Weizhou Wang, and Jiaqing Qi

References

  1. [1] A.M. Leite da Silva, W.S. Sales, L.A.F. Manso, & R. Billinton,Long-term probabilistic evaluation of operating reserve require-ments with renewable sources, IEEE Transactions on PowerSystems, 25(1), 2010, 106–116.
  2. [2] Z. Sun, J. Wu, G.J. Li, & J. He, Dynamic economic dispatchconsidering wind power penetration based on wind speedforecasting and stochastic programming, Proceedings of theCSEE, 29(4), 2009, 41–47.
  3. [3] H.-c. Wang, Z.-x. Lu, & S.-x. Zhou Research on the capacitycredit of wind energy resources, Proceedings of the CSEE,25(10), 2005, 103–106.
  4. [4] K.R. Voorspools & W.D. D’haeseleer, Critical evaluation ofmethods for wind-power appraisal, Renewable and SustainableEnergy Reviews, 11(1), 2007, 78–97.
  5. [5] B. Martin & J. Carlin, Wind-load correlation and estimates ofthe capacity credit of wind power: An empirical investigation,Wind Engineering, 7(2), 1983, 79–84.
  6. [6] R. Karki, P. Hu, & R. Billinton, Reliability evaluation consid-ering wind and hydro power coordination, IEEE Transactionson Power Systems, 25(2), 2010, 685–693.
  7. [7] Y. Wu, M. Ding & S. Li, Reliability assessment of wind farmsin generation, Transactions of China Electrotechnical Society,19(11), 2004, 72–76.
  8. [8] A.S. Dobakhshari & M. Fotuhi-Firuzabad, A reliability modelof large wind farms for power system adequacy studies, IEEETransactions on Energy Conversion, 24(3), 2009, 792–801.
  9. [9] B.M. Bibby, T.M. Skovgaard, & M. Sørensen, Diffusion-typemodels with given marginal distribution and autocorrelationfunction, Bernoulli Journal, 11(2), 2005, 191–220.
  10. [10] M. Doquet, Use of a stochastic process to sample wind powercurves in planning studies, IEEE Conf. Power Tech, Lausanne,2007.
  11. [11] M. Ding, W. Wu, & H.-b. Wu, Research on forecasting ofprobabilistic distribution parameters of wind speed and itsapplication, Power System Technology, 32(14), 2008, 10–14.
  12. [12] K. Xiea & R. Billinton, Considering wind speed correlation ofWECS in reliability evaluation using the time-shifting tech-nique, Electric Power Systems Research, 79(4), 2009, 687–693.
  13. [13] G.C. Thomann & M.J. Barfield, The time variation of windspeeds and wind farm power output in Kansas,IEEE Transac-tions on Energy Conversion, 3(1), 1988, 44–49.
  14. [14] H. Hannele, The impact of large scale wind farm integration inNordic countries, Doctoral Dissertation, Helsinki University,Finland, 2004.
  15. [15] SHEN Hong, HUANG Bing, CHI Yong-ning, et al, Trans-mission planning of Gansu Jiuquan wind power base, ChinaPower Engineering Consulting Group Corporation NorthwestElectric Power Design Institute, Xi’an, China, 2008.272

Important Links:

Go Back