Michael VanHilst, Shihong Huang, and Hugh Lindsay
[1] M. VanHilst, P. Garg, & C. Lo, Repository mining and SixSigma for process improvement, Proc. International Workshopon Mining Software Repositories, 2005. [2] J.M. Morgan & J.F. Liker, The Toyota product developmentsystem: integrating people, process and technology (New York,NY: Productivity Press, 2006). [3] M.N. Kennedy, Product development for the Lean enterprise:why Toyota’s system is four times more productive and howyou can implement it (Richmond, VA: Oaklea Press, 2003). [4] The lean aerospace initiative, Available: http://lean.mit.edu.Last accessed 19 June 2009. [5] M. Poppendieck & T. Poppendieck, Lean software development:an agile toolkit (Upper Saddle River, NJ: Addison-Wesley,2003). [6] M. Poppendieck & T. Poppendiech, Implementing Lean soft-ware development: from concept to cash (Upper Saddle River,NJ: Addison-Wesley, 2007). [7] S. Shingo, A study of the Toyota production system (New York,NY: Productivity Press, 1989). [8] S.H. Kan, J. Parrish, & D. Manlove, In process metrics forsoftware testing, IBM Systems Journal, 40 (1), 2001, 220–241. [9] A. Mockus, D. Weiss, & P. Zhang, Understanding and pre-dicting effort in software projects, Proc. 25th Int. Conf. onSoftware Engineering, 2003, 274–284. [10] P. Middleton & J. Sutton, Lean software strategies: proventechniques for managers and developers (New York, NY:Productivity Press, 2005). [11] D.G. Reinertsen, Managing the design factory: a productdeveloper’s toolkit (New York, NY: The Free Press, 1997). [12] M. Niazi, D. Wilson, & D. Zowghi, A maturity model for theimplementation of software process improvement: an empiricalstudy, Journal of Systems and Software, 74, 2005, 155–172. [13] A. Rainer & T. Hall, A quantitative and qualitative analysisof factors affecting software processes, Journal of Systems andSoftware, 66, 2003, 7–21. [14] P. Donzelli, A decision support systems for software projectmanagement, IEEE Software, 23 (4), 2006, 67–75. [15] B. Boehm & M. Turner, Management challenges to implement-ing agile processes in traditional development organizations,IEEE Software, 22 (5), 2005, 30–39. [16] D. Hartman & R. Daymond, Appropriate agile measurement:using metrics and diagnostics to deliver business value, Proc.IEEE AGILE 2006 Conf., 2006. [17] M. Lindvall, P. Donzelli, S. Asgari, & V. Basili, Towardsreusable measurement patterns, Proc. 11th IEEE Int. SoftwareMetrics Symposium, 2005, 21–28. [18] S. Kim & E.J. Whitehead, Jr., How long did it take to fixbugs?, Proc. Int. Workshop on Mining Software Repositories,2006, 173–174.55 [19] J. Sliwerski, T. Zimmerman, & A. Zeller, When do changesinduce fixes?, Proc. Int. Workshop on Mining Software Repos-itories, 2005. [20] M. Fischer, M. Pinzger, & H. Gall, Populating a release historydatabase from version control and bug tracking systems, Proc.Int. Conf. on Software Maintenance, 2003, 23–33. [21] S. Kim, T. Zimmermann, M. Kim, A. Hassan, A. Mockus, T.Girba, M. Pinzger, E.J. Whitehead, Jr., & A. Zeller, TA-RE:an exchange language for mining software repositories, Proc.Int. Workshop on Mining Software Repositories, 2006, 22–25. [22] J. Li, N. Jiang, Q. Wang, & Y. Yang, Tracking projects througha three-dimensional software development model, Proc. 31stAnnual Int. Computer Software and Applications Conf., 2007,v.1, 301–308. [23] S. Huang, S.R. Tilley, M. VanHilst, & D. Distante, Adoption-centric software maintenance process improvement via informa-tion integration, Proc. 13th IEEE Int. Workshop on SoftwareTechnology and Engineering Practice, 2005, 25–34. [24] M. VanHilst & S. Huang, Mining objective process metricsfrom repository data, Proc. 19th IEEE Int. Conf. on SoftwareEngineering and Knowledge Engineering, 2009. [25] S. Huang & C. Lo, Analyzing configuration managementrepository data for software process improvement, Proc. 19thIEEE Int. Conf. on Software Engineering and KnowledgeEngineering, 2007.
Important Links:
Go Back