Subhashis Chatterjee, Jeetendra B. Singh, Shobhit Nigam, and Lakshmi N. Upadhyaya
[1] J.D. Musa, A. Iannino, & K. Okumoto, Software reliabilitymeasurement, prediction, application (NY: McGraw-Hill Int.Ed., 1987). [2] M. Xie, Software reliability modeling (Singapore: World Sci-entific Press, 1991). [3] M.R. Lyu, Handbook of software reliability engineering(McGraw-Hill: NY, 1996). [4] Z. Jelinski & P.B. Moranda, Software reliability research,in W. Freiberger (Ed.), Statistical Computer PerformanceEvaluation (NY: Academic, 1972), 465–484. [5] M.L. Shooman, Probabilistic models for software reliabilityprediction, in W. Freiberger (Ed.), Statistical Computer Per-formance Evaluation (NY: Academic, 1972), 485–502. [6] G.J. Schick & R.W. Wolverton, An analysis of competingsoftware reliability model, IEEE Transaction on SoftwareEngineering, SE-4, 1978, 104–120. [7] J.D. Musa, A theory of software reliability and its application,IEEE Transaction on Software Engineering, SE-1, 1975,312–327. [8] B. Littlewood & J.L. Verrall, A Bayesian reliability growthmodel for computer software, Applied Statistics, 22, 1973,332–346. [9] N.D. Singpurwalla & R. Soyer, Assessing (software) reliabilitygrowth using a random co-efficient autoregressive process andits ramifications, IEEE Transaction on Software Engineering,SE-11, 1985, 1456–1464. [10] A.L. Goel & K. Okumoto, A time-dependent error detectionrate model for software reliability and other performancemeasure, IEEE Transaction on Reliability, R-28, 1979, 206–211. [11] M. Xie, A shock model for software reliability, Microelectronicsand Reliability, 27, 1987, 717–724. [12] P. Zeephongsekul, G. Xia, & S. Kumar, Software-reliabilitygrowth model: Primary failures generate secondary-faults un-der imperfect debugging, IEEE Transaction on Reliability,R-43, 1994, 408–413. [13] G. Xia, P. Zeephongsekul, & S. Kumar, Optimal softwarerelease policy with a learning factor for imperfect debugging,Microelectronic and Reliability, 33, 1993, 81–86. [14] H. Pham, A software cost model with imperfect debuggingrandom life cycle and penalty cost, International Journal ofSystems Science, 27, 1996, 455–463. [15] S. Chatterjee, R.B. Misra, & S.S. Alam, A generalized shockmodel for software reliability, Computer and ElectricalEngineering – An International Journal, 24, 1998, 363–368. [16] S.S. Gokhale, M.R. Lyu, & K.S. Trivedi, Incorporating faultdebugging activities into software reliability models: A simu-lation approach, IEEE Transactions on Reliability, R-55(2),2006, 281–292. [17] Y.S. Dai, M. Xie, & K.L. Poh, Modeling and analysis of cor-related software failures of multiple types, IEEE Transactionson Reliability, R-54(1), 2005, 100–106. [18] M. Xie, Y.S. Dai, & K.L. Poh, Distributed system availability inthe case of imperfect debugging process, International Journalof Industrial Engineering – Theory Applications and Practice,11(4), 2004, 396–405. [19] S. Chatterjee, R.B. Misra, & S.S. Alam, N-version programmingwith imperfect debugging, Computers & Electrical Engineering,30(6), 2004, 453–463. [20] D.H. Park & C.H. Lee, Markovian imperfect software debuggingmodel and its performance measures, Stochastic Analysis andApplications, 21(4), 2003, 849–864. [21] P.N. Misra, Software reliability analysis, IBM Systems Journal,22, 1983, 262–272. [22] S. Yamada & S. Osaki, Cost-reliability optimal release policiesfor software systems, IEEE Transaction on Reliability, R-31,1985, 422–424. [23] T. Bhaskar & U.D. Kumar, A cost model for N-version pro-gramming with imperfect debugging, Journal of the Opera-tional Research Society, 57(8), 2006, 986–994. [24] X. Zhang, X. Teng, & H. Pham, Considering fault removalefficiency in software reliability assessment, IEEE Transactionon Systems Man and Cybernetics – Part A: Systems andHumans, 33(1), 2003, 114–120. [25] N.D. Singpurwalla, Estimating reliability growth (or deteri-oration) using time series analysis, Naval Research LogisticsQuarterly, 27, 1980, 1–14. [26] S. Chatterjee, R.B. Misra, & S.S. Alam, Prediction of softwarereliability using auto regressive process, International Journalof System Science, 2(2), 1997, 211–216. [27] G.E.P. Box & G.M. Jenkins, Time series analysis, forecasting,and control (San Francisco, CA: Holden-Day, 1976). [28] M.C. Hurvich & C. Tsai, Regression and time series modelselection in small samples, Biometrika, 76, 1989, 297–307. [29] A. Sarkar & P.P. Kanjilal, On a method of identification ofbest subset model from full AR model, Communications inStatistics, 24(6), 1995, 1551–1567.124 [30] T. Subba Rao & M.M. Gaber, An introduction to bispectralanalysis and bilinear time series models, Lecture notes instatistics, 24 (New York: Springer Verlag, 1984), 270–275. [31] H. Tong, Threshold models in non-linear time series analysis,Lecture notes in statistics, 21 (New York: Springer Verlag,1983), 307–316. [32] L.A. Walls & A. Bendell, Time series method in reliability,Reliability Engineering and System Safety, 18, 1987, 239–265. [33] B. Burtschy, G. Albeanu, D.N. Boros, F. Popentiu, & V. Nicola,Improving software reliability forecasting, Microelectronics andReliability, 37, 1997, 901–907. [34] T.M. Khoshgoftaar & R.M. Szabor, Investigating ARIMAmodels of software system quality, Software Quality Journal,4, 1995, 33–48. [35] M. Xie & S.L. Ho, Analysis of repairable system failure datausing time series models, Journal of Quality in MaintenanceEngineering, 5, 1999, 50–61. [36] H. Akaike, Statistical predictor identification, Annals of theInstitute of Statistical Mathematics, 22, 1970, 203–217. [37] G. Schwarz, Estimating the dimension of a mode, Annals ofStatistics, 6, 1978, 461–464. [38] J.D. Musa, Software reliability data (NY: DACS, RADC/ISIS,1975).
Important Links:
Go Back