Bin-hua Xia, Zeng-shun Chen, Tian-long Li, and Yong-da Yang
[1] R. Tuladhar, W.H. Dilger, and M.M. Elbadry, Influence ofcable vibration on seismic response of cable-stayed bridges,Canadian Journal of Civil Engineering, 22, 1995, 1001–1020. [2] H. Tabatabai, Inspection and maintenance of bridge stay cablesystems: A synthesis of highway practice, TransportationResearch Board, 2005. [3] C. Li, J. He, C. Dong, and H. Li, Control of self-adaptiveunstressed configuration for incrementally launched girderbridges, Journal of Bridge Engineering, 20(10), 2014, 04014105. [4] J. Wu, D.M. Frangopol, and M. Soliman, Geometry controlsimulation for long-span steel cable-stayed bridges based ongeometrically nonlinear analysis, Engineering Structures, 90,2015, 71–82. [5] D.M. Frangopol and K. Imai, Geometrically nonlinear finiteelement reliability analysis of structural systems. II: Applications, Computers & Structures, 77, 2000, 693–709. [6] A. Freire, J. Negrao, and A. Lopes, Geometrical nonlinearitieson the static analysis of highly flexible steel cable-stayedbridges, Computers & Structures, 84, 2006, 2128–2140. [7] K. Imai and D.M. Frangopol, Geometrically nonlinear finiteelement reliability analysis of structural systems. I: Theory,Computers & Structures, 77, 2000, 677–691. [8] F. Au, J. Wang, and G. Liu, Construction control of reinforcedconcrete arch bridges, Journal of Bridge Engineering, 8, 2003,39–45. [9] D.M. Abraham and D.W. Halpin, Simulation of the con-struction of cable-stayed bridges, Canadian Journal of CivilEngineering, 25, 1998, 490–499. [10] M.J. Grabow, Construction stage analysis of cable-stayedbridges, Diploma Thesis, Civil and Environmental Engineering,Technical University of Hamburg Harburg, Germany, 2004. [11] J. Lozano-Galant, I. Pay´a-Zaforteza, D. Xu, and J. Turmo,Analysis of the construction process of cable-stayed bridgesbuilt on temporary supports, Engineering Structures, 40, 2012,95–106. [12] J.A. Lozano-Galant, I. Pay´a-Zaforteza, D. Xu, and J. Turmo,Forward algorithm for the construction control of cable-stayedbridges built on temporary supports, Engineering Structures,40, 2012, 119–130. [13] P.-H. Wang, T.-Y. Tang, and H.-N. Zheng, Analysis of cable-stayed bridges during construction by cantilever methods Computers & Structures, 82, 2004, 329–346. [14] D. Chen, F. Au, L. Tham, and P. Lee, Determination of initialcable forces in prestressed concrete cable-stayed bridges forgiven design deck profiles using the force equilibrium method,Computers & Structures, 74, 2000, 1–9. [15] D. Janjic, M. Pircher, and H. Pircher, Optimization of cabletensioning in cable-stayed bridges, Journal of Bridge Engi-neering, 8, 2003, 131–137. [16] A. Kasuga, H. Arai, J. Breen, and K. Furukawa, Optimumcable-force adjustments in concrete cable-stayed bridges, Journal of Structural Engineering, 121, 1995, 685–694. [17] J. Negr˜ao and L. Sim˜oes, Optimization of cable-stayed bridgeswith three-dimensional modelling, Computers & Structures,64, 1997, 741–758. [18] Z.-S. Chen, T.K. Tse, S.-M. Liu, J.-T. Zhou, and Y. Zeng,Application of a self-adaptive Kalman filter approach in alignment control for an extra long span rail transit cable-stayedbridge, Structure and Infrastructure Engineering, 2016, 1–12.DOI: http://dx.doi.org/10.1080/15732479.2016.1257644. [19] Z.-S. Chen, J.-T. Zhou, G. Hu, Y. Li, H. Ma, and G.W. Yao,Field test and analysis of a noval movable scaffolding system(MSS) for a long span curved bridge, International Journal ofRobotics and Automation, 32, 2017. [20] J.M. Brownjohn, A. De Stefano, Y.-L. Xu, H. Wenzel, andA.E. Aktan, Vibration-based monitoring of civil infrastructure:challenges and successes, Journal of Civil Structural HealthMonitoring, 1, 2011, 79–95. [21] C. Gentile, Deflection measurement on vibrating stay cables bynon-contact microwave interferometer, NDT & E International,43, 2010, 231–240. [22] B.H. Kim and T. Park, Estimation of cable tension force usingthe frequency-based system identification method, Journal ofSound and Vibration, 304, 2007, 660–676. [23] GB50157, Code for design of metro, National Standard of thePeople’s Republic of China, 2003. [24] TB10002.3, Code for design of concrete and prestressed concretestructures in railway bridges and culverts, National Standardof the People’s Republic of China, 2005. [25] Z. Pan, B. Li, and Z. Lu, Re-evaluation of CEB-FIP 90prediction models for creep and shrinkage with experimentaldatabase, Construction and Building Materials, 38, 2013,1022–1030. [26] Q. Li, Y. Bu, and Q. Zhang, Whole-procedure adaptive construction control system based on geometry control method,China Civil Engineering Journal, 42, 2009, 69–77.
Important Links:
Go Back